Tru-Stock AI
Find the cash trapped in your inventory, then size reorder points, safety stock and EOQ.
Sollte ich dies verwenden
Qualität und Sicherheit
Befunde (1)
- LOWin calculate_economic_order_quantity
Basierend auf einer automatisierten Analyse der Tool-Definitionen und der Einhaltung des Protokolls.
Kontextkosten
Dies ist die ungefähre Anzahl der Tokens, die jedes Mal verbraucht werden, wenn die Tools des Servers in den Kontext eines Modells geladen werden. Höhere Werte verringern die Aufmerksamkeit, die für andere Aufgaben verfügbar ist.
Installieren
Installation mit einem Klick
Fügen Sie dies Ihrer Datei `claude_desktop_config.json` hinzu:
{
"mcpServers": {
"inventory": {
"url": "https://www.tru-stock.ai/api/mcp/public"
}
}
}Remote-Endpunkte
https://www.tru-stock.ai/api/mcp/publicstreamable-httpWas es kann
Tool-Inventar
Tools (7)
🟢calculate_reorder_point(avgDailyDemand, leadTimeDays, demandStdDev, leadTimeStdDev, serviceLevel)
Calculate the reorder point (when to place a new order) for an inventory item, using the King formula for safety stock. Returns the reorder point, safety stock, and demand during lead time. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/reorder-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"avgDailyDemand": {
"type": "number",
"description": "Average units sold per day"
},
"leadTimeDays": {
"type": "number",
"description": "Average vendor lead time in days"
},
"demandStdDev": {
"type": "number",
"description": "Standard deviation of daily demand (optional)"
},
"leadTimeStdDev": {
"type": "number",
"description": "Standard deviation of lead time in days (optional)"
},
"serviceLevel": {
"type": "string",
"description": "Target service level: 85, 90, 95, 97 or 99. Default 95"
}
},
"required": [
"avgDailyDemand",
"leadTimeDays"
]
}🟢calculate_safety_stock(avgDailyDemand, demandStdDev, avgLeadTimeDays, leadTimeStdDev, serviceLevel, ...)
Calculate how much safety stock to hold to protect against demand and lead-time variability, using the King formula. Returns units and the capital tied up. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/safety-stock-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"avgDailyDemand": {
"type": "number",
"description": "Average units sold per day"
},
"demandStdDev": {
"type": "number",
"description": "Standard deviation of daily demand"
},
"avgLeadTimeDays": {
"type": "number",
"description": "Average vendor lead time in days"
},
"leadTimeStdDev": {
"type": "number",
"description": "Standard deviation of lead time in days"
},
"serviceLevel": {
"type": "string",
"description": "Target service level: 85, 90, 95, 97 or 99. Default 95"
},
"unitCost": {
"type": "number",
"description": "Unit cost, to value the safety stock (optional)"
}
},
"required": [
"avgDailyDemand",
"avgLeadTimeDays"
]
}🟢calculate_economic_order_quantity(annualDemand, orderCost, unitCost, holdingCostPerUnit, holdingCostPct)
Calculate the Economic Order Quantity (EOQ) — the order size that minimises combined ordering and holding cost. Returns EOQ, orders per year, and total annual cost. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/eoq-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"annualDemand": {
"type": "number",
"description": "Units sold per year"
},
"orderCost": {
"type": "number",
"description": "Fixed cost to place one order"
},
"unitCost": {
"type": "number",
"description": "Cost per unit"
},
"holdingCostPerUnit": {
"type": "number",
"description": "Annual holding cost per unit (optional; otherwise derived from unitCost)"
},
"holdingCostPct": {
"type": "number",
"description": "Annual holding cost as % of unit cost. Default 25"
}
},
"required": [
"annualDemand",
"orderCost"
]
}🟢calculate_inventory_turnover(cogs, averageInventoryValue, revenue)
Calculate inventory turnover ratio, days sales of inventory (DSI) and GMROI from COGS and average inventory value. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/inventory-turnover-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"cogs": {
"type": "number",
"description": "Annual cost of goods sold"
},
"averageInventoryValue": {
"type": "number",
"description": "Average inventory value at cost"
},
"revenue": {
"type": "number",
"description": "Annual revenue, for GMROI and margin (optional)"
}
},
"required": [
"cogs",
"averageInventoryValue"
]
}🟢calculate_carrying_cost(inventoryValue, warehouseCost, insuranceCost, shrinkagePct, depreciationPct, ...)
Calculate the true annual cost of holding inventory — warehousing, insurance, shrinkage, depreciation and opportunity cost — as a total and as a percentage of inventory value. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/carrying-cost-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"inventoryValue": {
"type": "number",
"description": "Average inventory value at cost"
},
"warehouseCost": {
"type": "number",
"description": "Annual warehousing cost"
},
"insuranceCost": {
"type": "number",
"description": "Annual insurance cost"
},
"shrinkagePct": {
"type": "number",
"description": "Annual shrinkage as % of inventory value"
},
"depreciationPct": {
"type": "number",
"description": "Annual obsolescence/depreciation as % of value"
},
"opportunityCostPct": {
"type": "number",
"description": "Cost of capital as % of value"
}
},
"required": [
"inventoryValue"
]
}🟢calculate_lead_time(processingDays, productionDays, shippingDays, receivingDays, varianceDays, ...)
Add up total vendor lead time from its stages (processing, production, shipping, receiving) and work out the demand that must be covered during it. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/lead-time-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"processingDays": {
"type": "number",
"description": "Days for the vendor to process the order"
},
"productionDays": {
"type": "number",
"description": "Days to manufacture"
},
"shippingDays": {
"type": "number",
"description": "Days in transit"
},
"receivingDays": {
"type": "number",
"description": "Days to receive and put away"
},
"varianceDays": {
"type": "number",
"description": "Typical extra days when things run late"
},
"avgDailyDemand": {
"type": "number",
"description": "Average units sold per day (optional)"
}
},
"required": []
}🟢estimate_trapped_capital(inventoryValue, annualRevenue, stockoutPct, deadStockPct, avgMarginPct, ...)
Size the cash trapped in inventory — dead stock, stockout losses and carrying cost — from your own figures. Returns a RANGE rather than a single number when inputs are left at their defaults, because those defaults are assumptions about your business. Free tool by Tru-Stock AI — https://www.tru-stock.ai/tools/roi-calculator
Eingabe-Schema
{
"type": "object",
"properties": {
"inventoryValue": {
"type": "number",
"description": "Current inventory value at cost"
},
"annualRevenue": {
"type": "number",
"description": "Annual revenue"
},
"stockoutPct": {
"type": "number",
"description": "Revenue lost to stockouts, %. Default 5"
},
"deadStockPct": {
"type": "number",
"description": "Inventory that is dead stock, %. Default 15"
},
"avgMarginPct": {
"type": "number",
"description": "Average gross margin, %. Default 25"
},
"carryingCostRatePct": {
"type": "number",
"description": "Annual cost of holding stock as % of its value. Default 25"
}
},
"required": [
"inventoryValue",
"annualRevenue"
]
}Community
Nachweis