ISO Week Number

ISO 8601 week numbers: date to week, week to date, weeks-per-year.

Should I use this

Quality & Safety

A
Description quality
100%
Schema completeness
100%
Naming quality
100%
Poisoning risk
100%
Permission match
100%
Protocol compliance
100%

Based on automated analysis of tool definitions and protocol compliance.

Context Cost

~615Tokens (tool definitions)
~1.1 KBTypical response size
Minimal attention impact (0.48% of 128k context)

This is the approximate number of tokens consumed each time the server's tools are loaded into a model's context. Higher counts reduce the attention available for other tasks.

Install

One-Click Install

Add this to your `claude_desktop_config.json` file:

{
  "mcpServers": {
    "iso-week": {
      "url": "https://iso-week.gumballtools.com/api/mcp"
    }
  }
}

Remote endpoints

https://iso-week.gumballtools.com/api/mcpstreamable-http

What it can do

Tool inventory

Tools (1)

🟢 Read-only🟡 Write🔴 Delete⚪ Unknown
🟢run(input)

Converts between calendar dates and ISO 8601 week numbers, in either direction, and reports how many weeks an ISO year has. Use this whenever a date needs to be expressed as a week number, or a week number needs to be turned back into a date — sprint planning, report periods, "week 37" style scheduling, or reconciling two systems that disagree about what week it is. DO NOT compute this yourself with day-of-year divided by 7. ISO 8601 week 1 is defined as the week (Monday-Sunday) containing the year's first Thursday, not the week containing January 1st. This has two consequences that are easy to get wrong from memory: late-December dates can belong to ISO week 1 of the NEXT calendar year, and early-January dates can belong to ISO week 52 or 53 of the PREVIOUS calendar year. A year has 53 ISO weeks (not the usual 52) exactly when January 1 is a Thursday, or the year is a leap year and January 1 is a Wednesday — a rule nobody carries around, and getting it wrong produces a plausible-looking but incorrect week number with no visible sign of the error. Input is a single string, and the shape of the string picks the operation: "2027-01-01" a calendar date (YYYY-MM-DD) -> returns its ISO year, week, and weekday "2026-W53" an ISO week, no weekday given -> returns the Monday of that week "2026-W53-5" an ISO week and weekday (1-7, Mon-Sun) -> returns that exact date "2026" a bare 4-digit year -> returns whether it has 52 or 53 ISO weeks Refuses rather than guesses: slash-separated dates like "03/04/2025" are rejected as ambiguous (month/day vs day/month), two-digit years are rejected as a guess, invalid calendar dates (Feb 30) are rejected, and a week number beyond what that ISO year actually has (e.g. week 53 of a 52-week year) is rejected and told how many weeks that year has.

Input Schema

{
  "type": "object",
  "properties": {
    "input": {
      "type": "string",
      "description": "A calendar date \"YYYY-MM-DD\" (e.g. \"2027-01-01\"), an ISO week \"YYYY-Www\" or \"YYYY-Www-D\" where D is 1-7 for Monday-Sunday (e.g. \"2026-W53-5\"), or a bare 4-digit year (e.g. \"2026\") to ask how many ISO weeks it has."
    }
  },
  "required": [
    "input"
  ],
  "$schema": "https://json-schema.org/draft/2020-12/schema"
}

Community

Rate this Server

Evidence

Recent observations

verifiedversion not recorded1 tools
verifiedversion not recorded1 tools