change-order
Change orders against a quote or work order: deltas, approval, running contract value.
我该使用它吗
质量与安全性
基于对工具定义和协议合规性的自动分析。
上下文开销
这是每次将服务器的工具加载到模型上下文窗口时所消耗的大致 token 数。数值越高,可用于其他任务的注意力就越少。
安装
一键安装
将以下内容添加到你的 `claude_desktop_config.json` 文件中:
{
"mcpServers": {
"change-order": {
"command": "uvx",
"args": [
"https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb"
]
}
}
}可运行的软件包
0.22.0stdio远程端点
https://mcp.zovo.one/mcp/change-orderstreamable-http它能做什么
工具清单
工具(11)
🟡change_order_create(reference, reference_kind, client, title, date, ...)
Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.
输入模式
{
"type": "object",
"properties": {
"reference": {
"type": "string",
"maxLength": 64,
"description": "The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001"
},
"reference_kind": {
"type": "string",
"enum": [
"quote",
"work_order"
],
"description": "What the reference is. Inferred from the id when omitted: WO-... is a work order, anything else a quote"
},
"client": {
"type": "string",
"maxLength": 200,
"description": "The client the change is agreed with, as named on the quote or work order"
},
"title": {
"type": "string",
"maxLength": 2000,
"description": "What the change is, in one line, e.g. Add a second landing page and drop hosting"
},
"date": {
"type": "string",
"maxLength": 10,
"description": "The day the change was raised, YYYY-MM-DD. Default today"
},
"currency": {
"type": "string",
"pattern": "^[A-Za-z]{3}$",
"description": "ISO code the contract is priced in. Defaults to the shared business profile's currency"
},
"original_value_minor": {
"type": "integer",
"minimum": 0,
"maximum": 1000000000000,
"description": "The contract value BEFORE any change order, net of VAT, in whole minor units. Required on the first change order against a reference; inherited by every later one"
},
"note": {
"type": "string",
"maxLength": 2000
},
"duplicate_ok": {
"type": "boolean",
"description": "Raise it even though an identical change order exists on this reference. Default false"
}
},
"required": [
"reference",
"client",
"title"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_add_line(change_order, kind, description, quantity, unit_price_minor, ...)
Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
},
"kind": {
"type": "string",
"enum": [
"added",
"removed",
"changed"
],
"description": "added for new work, removed for work taken out, changed for a line whose quantity or price moves"
},
"description": {
"type": "string",
"maxLength": 2000,
"description": "The line as it reads on the quote or work order, e.g. Website audit"
},
"quantity": {
"type": "number",
"exclusiveMinimum": 0,
"maximum": 1000000,
"description": "added or removed: how many. changed: the NEW quantity"
},
"unit_price_minor": {
"type": "integer",
"minimum": 0,
"maximum": 1000000000000,
"description": "added or removed: the unit price in whole minor units. changed: the NEW unit price. 45000 is EUR 450.00"
},
"was_quantity": {
"type": "number",
"exclusiveMinimum": 0,
"maximum": 1000000,
"description": "changed only: the quantity before the change"
},
"was_unit_price_minor": {
"type": "integer",
"minimum": 0,
"maximum": 1000000000000,
"description": "changed only: the unit price before the change, in whole minor units"
},
"reason": {
"type": "string",
"maxLength": 2000,
"description": "Why, in the client's words if you have them, e.g. Client asked for a second page after the kickoff"
},
"date": {
"type": "string",
"maxLength": 10,
"description": "The day the change was asked for, YYYY-MM-DD. Default the change order's date"
},
"tax_rate": {
"type": "number",
"minimum": 0,
"maximum": 1000,
"description": "VAT percent for this line, overriding the shared profile's default"
},
"note": {
"type": "string",
"maxLength": 2000
}
},
"required": [
"change_order",
"kind",
"description",
"quantity",
"unit_price_minor",
"reason"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_status(change_order, status, date, note)
Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
},
"status": {
"type": "string",
"enum": [
"draft",
"sent",
"approved",
"rejected",
"void"
],
"description": "The status to move to"
},
"date": {
"type": "string",
"maxLength": 10,
"description": "The day it happened, YYYY-MM-DD. Default today"
},
"note": {
"type": "string",
"maxLength": 2000,
"description": "What happened, e.g. Emailed to the client, or Approved by phone, confirmed in writing"
}
},
"required": [
"change_order",
"status"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_get(change_order)
Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
}
},
"required": [
"change_order"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_list(reference, status, client, from, to, ...)
List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.
输入模式
{
"type": "object",
"properties": {
"reference": {
"type": "string",
"maxLength": 64,
"description": "Only change orders against this quote or work order"
},
"status": {
"type": "string",
"enum": [
"draft",
"sent",
"approved",
"rejected",
"void",
"open"
],
"description": "One status, or open for draft and sent together"
},
"client": {
"type": "string",
"maxLength": 200,
"description": "Only change orders whose client name contains this text"
},
"from": {
"type": "string",
"maxLength": 10,
"description": "Earliest date, YYYY-MM-DD"
},
"to": {
"type": "string",
"maxLength": 10,
"description": "Latest date, YYYY-MM-DD"
},
"limit": {
"type": "integer",
"minimum": 1,
"maximum": 500,
"description": "Maximum rows returned, default and ceiling 500"
}
},
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🔴change_order_delete(change_order)
Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
}
},
"required": [
"change_order"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡contract_value(reference)
The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.
输入模式
{
"type": "object",
"properties": {
"reference": {
"type": "string",
"maxLength": 64,
"description": "The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001"
}
},
"required": [
"reference"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_document(change_order)
Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
}
},
"required": [
"change_order"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟡change_order_invoice_payload(change_order, issue_date, tax_rate)
Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.
输入模式
{
"type": "object",
"properties": {
"change_order": {
"type": "string",
"maxLength": 200,
"description": "The change order id, e.g. CO-2026-0001, or its title when only one carries it"
},
"issue_date": {
"type": "string",
"maxLength": 10,
"description": "The invoice issue date, YYYY-MM-DD. Default today"
},
"tax_rate": {
"type": "number",
"minimum": 0,
"maximum": 1000,
"description": "VAT percent for lines with no rate of their own, overriding the shared business profile's default"
}
},
"required": [
"change_order"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}🟢license_status
Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.
输入模式
{
"type": "object",
"properties": {},
"$schema": "http://json-schema.org/draft-07/schema#"
}⚪license_activate(key)
Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.
输入模式
{
"type": "object",
"properties": {
"key": {
"type": "string",
"description": "License key from checkout, MCPL1.<payload>.<signature>"
}
},
"required": [
"key"
],
"additionalProperties": false,
"$schema": "http://json-schema.org/draft-07/schema#"
}社区
证据