ISO Week Number

ISO 8601 week numbers: date to week, week to date, weeks-per-year.

Should I use this

Quality & Safety

A
Description quality
100%
Schema completeness
100%
Naming quality
100%
Poisoning risk
100%
Permission match
100%
Protocol compliance
100%

Based on automated analysis of tool definitions and protocol compliance.

Context Cost

~615Tokens (tool definitions)
~1.1 KBTypical response size
Minimal attention impact (0.48% of 128k context)

This is the approximate number of tokens consumed each time the server's tools are loaded into a model's context. Higher counts reduce the attention available for other tasks.

Install

One-Click Install

Add this to your `claude_desktop_config.json` file:

{
  "mcpServers": {
    "iso-week": {
      "url": "https://iso-week.gumballtools.com/api/mcp"
    }
  }
}

Remote endpoints

https://iso-week.gumballtools.com/api/mcpstreamable-http

What it can do

Tool inventory

Tools (1)

🟢 Read-only🟡 Write🔴 Delete⚪ Unknown
🟢run(input)

Converts between calendar dates and ISO 8601 week numbers, in either direction, and reports how many weeks an ISO year has. Use this whenever a date needs to be expressed as a week number, or a week number needs to be turned back into a date — sprint planning, report periods, "week 37" style scheduling, or reconciling two systems that disagree about what week it is. DO NOT compute this yourself with day-of-year divided by 7. ISO 8601 week 1 is defined as the week (Monday-Sunday) containing the year's first Thursday, not the week containing January 1st. This has two consequences that are easy to get wrong from memory: late-December dates can belong to ISO week 1 of the NEXT calendar year, and early-January dates can belong to ISO week 52 or 53 of the PREVIOUS calendar year. A year has 53 ISO weeks (not the usual 52) exactly when January 1 is a Thursday, or the year is a leap year and January 1 is a Wednesday — a rule nobody carries around, and getting it wrong produces a plausible-looking but incorrect week number with no visible sign of the error. Input is a single string, and the shape of the string picks the operation: "2027-01-01" a calendar date (YYYY-MM-DD) -> returns its ISO year, week, and weekday "2026-W53" an ISO week, no weekday given -> returns the Monday of that week "2026-W53-5" an ISO week and weekday (1-7, Mon-Sun) -> returns that exact date "2026" a bare 4-digit year -> returns whether it has 52 or 53 ISO weeks Refuses rather than guesses: slash-separated dates like "03/04/2025" are rejected as ambiguous (month/day vs day/month), two-digit years are rejected as a guess, invalid calendar dates (Feb 30) are rejected, and a week number beyond what that ISO year actually has (e.g. week 53 of a 52-week year) is rejected and told how many weeks that year has.

Input Schema

{
  "type": "object",
  "properties": {
    "input": {
      "type": "string",
      "description": "A calendar date \"YYYY-MM-DD\" (e.g. \"2027-01-01\"), an ISO week \"YYYY-Www\" or \"YYYY-Www-D\" where D is 1-7 for Monday-Sunday (e.g. \"2026-W53-5\"), or a bare 4-digit year (e.g. \"2026\") to ask how many ISO weeks it has."
    }
  },
  "required": [
    "input"
  ],
  "$schema": "https://json-schema.org/draft/2020-12/schema"
}

Community

Rate this Server

Evidence

Recent observations

verifiedversion not recorded1 tools
verifiedversion not recorded1 tools
verifiedversion not recorded1 tools
verifiedversion not recorded1 tools
verifiedversion not recorded1 tools
verifiedversion not recorded1 tools